1993 |
趙玉, 1993.09, 'Iteration Bounds of Single-rate Data Flow Graphs For Concurrent Processing, '., vol. 119078, Sep. 1993 |
1993 |
Adiga, Sadashiv*;Woo-Tsong Lin, 1993.04, 'An Object-Oriented Architecture for Knowledge-based Production Scheduling Systems, ' Journal of Intelligent Manufacturing, Vol.4, No.2, pp.139-150.(SCI)(*為通訊作者), vol. 119058, Apr. 1993 |
1993 |
楊建民;劉立倫;林震岩, 1993.03, '以範例學習法研究重要性判斷行為, ' 國立政治大學學報, Vol.66, No.下, pp.249-268.(TSSCI), vol. 118718, Mar. 1993 |
1993 |
Johannes K. Chiang*;T. Pfeifer, 1993, 'A Factory-wide Quality Information System based on Hypertext and QFD-towards a Scheme for Co-Design and Simultaneous Engineering, ' Proposal and Communication of Esprit Programmes 93, Commission of European Communities,.(*為通訊作者), vol. 255389, 1993 |
1993 |
Tsaih, R.*, 1993, 'The Softening Learning Procedure, ' Mathematical and Computer Modelling, Vol.18, No.8, pp.61-64.(SCI)(*為通訊作者), vol. 135246, 1993 |
1993 |
26. Venkateswara, V.S;Chen, Chuen-Lung*;Bullington, S.F, 1993, 'An Effective Heuristic for Flow Shop Problems with Total Flow Time as Criterion, ' Computers and Industrial Engineering, Vol.25, pp.219-222.(SCIE)(*為通訊作者), vol. 308539, 1993 |
1993 |
Chen, Chuen-Lung*;Bullington, S. F., 1993, 'Development of a Strategic Research Plan for an Academic Department Through the Use of Quality Function Deployment, ' Computers and Industrial Engineering, Vol.25, pp.49-52.(SCIE)(*為通訊作者), vol. 308538, 1993 |
1993 |
Chen, Chuen-Lung;Bulfin, R.L*, 1993, 'Complexity Results for Single Machine Scheduling Problems with Two Criteria, ' European Journal of Operational Research, Vol.70, No.1, pp.115-125.(SCIE)(*為通訊作者), vol. 308537, 1993 |
1993 |
吳柏林;劉文卿, 1993, '隨機模式與混沌模式之預測穩健性探討, '., vol. 125000, 1993 |
1993 |
Vinze, A.S.;Sen, A.;Liou, S.T.(曾淑峰), 1993, 'Operationalization of Opportunistic Behavior in Model Formulation, ' International Journal of Man-Machine Studies, Vol.38, pp.509-540.(SCI), vol. 118517, 1993 |