1994 |
Chen, Chuen-Lung;Bulfin, R.L*, 1994, 'Scheduling a Single Machine to Minimize Two Criteria: Maximum Tardiness and Number of Tardy Jobs, ' IIE Transactions, Vol.26, No.5, pp.76-84.(SCIE)(*為通訊作者), vol. 308535, 1994 |
1994 |
Sen, A.;Vinze, A.S.;Liou, S.T.(曾淑峰), 1994, 'Role of Control in the Model Formulation Process, ' Information Systems Research, Vol.5, No.3, pp.219-248.(SSCI), vol. 117937, 1994 |
1994 |
湯宗益, 1994, 'Academic Directions of the IS Key Issues, '., vol. 118514, 1994 |
1994 |
趙玉, 1994, 'An Interactive Tool for Design, Simulation, Verification, and Synthesis of Protocols, '., vol. 119092, 1994 |
1994 |
趙玉, 1994, 'A Synthesis Technique Of General Petri Nets, '., vol. 119076, 1994 |
1993 |
楊建民;張泰生;陳順吉, 1993.12, '在傳算器系統上發展非同步平行疊代法解線性互補問題, ' 管理科學學報, Vol.10, No.2, pp.223-244.(TSSCI), vol. 118720, Dec. 1993 |
1993 |
余千智, 1993.10, 'Designing a Multimedia Database for Electronic Publication Systems, '., vol. 120137, Oct. 1993 |
1993 |
楊建民;林震岩;林妙崔, 1993.10, '我國稅捐稽徵機關電作人員類型與資訊作業績效關係之研究, ' 國立政治大學學報, Vol.67, No.下, pp.531-551.(TSSCI), vol. 118518, Oct. 1993 |
1993 |
趙玉, 1993.09, 'Iteration Bounds of Single-rate Data Flow Graphs For Concurrent Processing, '., vol. 119078, Sep. 1993 |
1993 |
Adiga, Sadashiv*;Woo-Tsong Lin, 1993.04, 'An Object-Oriented Architecture for Knowledge-based Production Scheduling Systems, ' Journal of Intelligent Manufacturing, Vol.4, No.2, pp.139-150.(SCI)(*為通訊作者), vol. 119058, Apr. 1993 |